JB HiFi Strathpine

JB HiFi Strathpine

JB HiFi Strathpine was fit out by RJR Shopfitting in record time.  With opening day timed to coincide with the grand opening of the new Westfield Strathpine extension, meeting this deadline was crucial.

Designers from Westfield and JB HiFi were in discussions regarding shop front layouts and materials to be used right up to the last minute, which left RJR Shopfitting with only one week to deliver the project.

This shopfront was nearly 50m long and over 3.6m high and was to be done in a 2pac gloss finish. Luckily, RJR Shopfitting have the ability to do 2pac in house, resulting in another JB HiFi store successfully opening on time.

Services provided by RJR Shopfitting:

  • Structural steel manufacturing
  • Electrical
  • Data
  • Painters
  • Air conditioning
  • Security
  • Plasterers
  • Suspended ceilings
  • Flooring
  • Signage
  • Fire services
  • 2 pac polyurethane spray painting.
  • Glazing